목차 1.Introduction 2.Case Analysis 3.Solutions 4.Creative
IDEA
본문 Presentation of NCC & The Cranberry
Industry
Cranberry Grower
99% of the Berries sold were
produced by Cooperatives
New techniques
Water
Harvesting
High Mechanization
allowed a faster treatment of
fruits
Explanation of the RP1’s Main Problems
Incontrollable
Overtime Costs
Excessive Waiting Time (Overtime)
Increasing
Growers’ Complaining
Capacity Analysis
Berries Upload to
Dump
Average Truck Delivery is 75bbl Suppose to Take 10minutes to Each
Truck.
Each Dumps Capacity =75(bbl/hr)×6=450(bbl/hr) Total
Dumps Capacity =450(bbl/hr)×5=2,250(bbl/hr
본문내용 n Presentation
of NCC & The Cranberry Industry Cranberry Grower New
techniques High Mechanization 1 2 3 Massive Production of
Berries 99% of the Berries sold were produced by Cooperatives Water
Harvesting allowed a faster treatment of
fruits
Introduction Explanation of the RP1’s Main
Problems Increasing Growers’ Complaining Incontrollable Overtime
Costs Excessive Waiting
Time (Overtime) 1 2